top of page
Optimaflot Top
"Azerbaijan" Crane Ship
The following works were performed by RS Group Design on the ship under repair at Baku Shupyard plant between 22.12.2021 and 13.01.2022:
During the repair, the following works were carried out:
- Inspection of the underwater and submarine parts of the ship's hull and prepare a report
- Inspection and report of vertical grille Kingston box fittings
- Inspection and report preparation of horizontal barred Kingston box
As an "RS GROUP DESIGN" LLC, we are committed to providing you sustainable, guaranteed, and efficient services, during conducting new projects.
Contact
bottom of page