top of page
Optimaflot Top

"Victor Martynenko" 

The ship "Victor Martyenko" was accepted for repair on 01.10.2021, the repair process was completed on 12.10.2021. The following works were performed on the ship during the repair process.

Victor Martynenko

During the repair, the following works were carried out:

​

- Carrying out metal thickness measurements

​

- Preparation of a report in accordance with the requirements of the classification society in the VOLNA program.

As an "RS GROUP DESIGN" LLC, we are committed to providing you sustainable, guaranteed, and efficient services, during conducting new projects.

Contact

© Copyrights 2023 by RS-Group Design B.G. All rights reserved.

bottom of page