"Volga Balt 225"
The ship "Volgo Balt 225" was accepted for repair on 31.08.2021, the repair process was completed on 10.09.2021. The ship was taken to a dry shipyard at the Bibiheybat shipyard. The following works were carried out during the repair process:
![]() | ![]() | ![]() | ![]() | ![]() |
---|